Suppose you are buying a $520,000 new construction home in Atlee, VA, putting 10% down ($52,000), and financing $468,000 over 30 years. These numbers are illustrations, not a quote or a current offer. I assume a 6.50% note interest rate, a $4,420 annual property tax bill (an illustrative $0.85 per $100 of assessed value), $1,800 a year for homeowners insurance, and conventional mortgage insurance at an assumed 0.35% a year. The APR would run slightly above the note rate once fees are counted, and it depends on the actual quote.
- Principal and interest: about $2,958 a month
- Property tax: $4,420 ÷ 12 = $368
- Homeowners insurance: $1,800 ÷ 12 = $150
- Mortgage insurance: $468,000 × 0.35% ÷ 12 = $137
- Total at completion: about $3,613 a month
Now compare the build period. With a construction-to-permanent loan, you pay interest only on the money drawn so far. Assume a 7.50% construction cost and a nine-month build. Payments climb from near zero to about $2,925 a month at full draw, averaging roughly $1,463 and totaling about $13,160. With a standard purchase loan that closes at completion, you pay no loan interest during the build, but you need a lock that covers it. If an extended lock costs an illustrative 0.25% of the loan, that is $1,170.
An Atlee VA new construction mortgage is a loan that funds a home that is not yet finished. The right structure depends on your builder contract, your rate-lock timeline, and your down payment. I’m Duane Buziak, NMLS #1110647, and below I walk through the structures, loan types, timeline, costs, and common mistakes. Use the contents list to jump around.
- What Is an Atlee VA New Construction Mortgage?
- Which Loan Types Work for New Construction in Hanover County?
- How the Timeline from Contract to Closing Works
- Closing Costs, Deposits, and Hanover County Property Taxes on a New Build
- Broker vs. Bank vs. National Lender for a New Build
- Common Mistakes Atlee Buyers Make on New Construction Financing
- Frequently Asked Questions About Atlee VA New Construction Mortgages
- Match the Structure to Your Lock, Loan Type, and Contract
What Is an Atlee VA New Construction Mortgage?
A new construction mortgage finances a home that is being built. It comes in two main forms: a one-time-close construction-to-permanent loan, or a standard purchase loan that closes at completion while the builder carries the construction costs.
Four terms come up in every conversation:
- One-time close: a single application and closing that covers both the build and your long-term mortgage.
- Construction-to-permanent loan: a loan that funds construction first, then converts to a regular mortgage when the home is finished.
- Draw schedule: the set of payments released to the builder as inspected stages of work are completed.
- Interest-only construction period: the build phase, when you pay interest only on the amount drawn so far.
In and around Atlee Station and nearby Hanover County, VA communities, many buyers commute along I-95 and Route 301 to Richmond. Builders serving that demand commonly sell two ways. Some sell to-be-built homes, where you choose a plan and finishes and the home is built after you sign. Others sell inventory homes, which are already under construction or finished.
The way the builder sells usually points to the loan. A builder who funds construction and sells you the finished home typically works with a standard purchase loan that closes at completion. If you own the lot, or hire a builder who is paid in draws, a construction-to-permanent loan is more common. Ask the builder which structure the contract assumes before you pick a lender.
Which Loan Types Work for New Construction in Hanover County?
Conventional, FHA, and VA loans can all finance new builds. Each has its own property rules, and those rules change, so confirm them on the agency pages before you rely on them. What follows reflects my understanding as of 2026.
Conventional
Fannie Mae and Freddie Mac publish the guidelines for conventional loans, including how they treat construction-to-permanent financing and homes that are not yet complete. Loan size matters too. The FHFA sets the conforming loan limit each year. I won’t quote a figure here from memory, so check the FHFA page for the current limit for Hanover County in the Richmond area as of 2026.
FHA
HUD sets FHA program rules and county loan limits. FHA requires the home to meet its minimum property requirements. For a home that is not complete, the file generally needs documentation such as a new construction inspection or a certificate of occupancy. Look up the current FHA limit for the Richmond MSA on HUD’s site as of 2026.
VA
The VA home loan program can be used on new construction when the home meets VA’s minimum property requirements, and the specific new-construction documentation steps are listed on VA.gov. The Certificate of Eligibility can usually be pulled electronically on your behalf. If you have used part of your entitlement before, second-tier entitlement may matter, so bring that up early.
USDA
USDA eligibility is decided by address, not by town. I only discuss USDA after the official USDA eligibility map confirms the specific property. No whole community qualifies as a block, and I would not tell you otherwise.
How the Timeline from Contract to Closing Works
The order of steps matters more on a new build than on a resale home, because the contract and the lock are tied to a construction schedule.
- Review the builder contract, including the completion date, extension terms, and any incentive tied to a lender.
- Start a NoTouch Credit Pull soft pull pre-approval: no credit hit, no cost, no fees, and no commitment.
- Choose a lender or broker after comparing the full cost of each option.
- Decide on a rate-lock strategy based on the build length.
- Track construction progress and, on a construction loan, the draw inspections.
- Complete the final inspection and walkthrough.
- Close, and move in.
A standard 30 to 60 day lock rarely covers a 6 to 12 month build. Lenders generally offer a few general approaches: lock closer to completion, pay for a longer lock, or use a float-down, which lets you reset to a lower market cost once if conditions improve. Availability, cost, and terms vary by lender and change over time, so ask for the details in writing before you sign.
The durations below are typical examples only. Confirm the real ones with your builder.
| Milestone | Illustrative duration | What you do |
|---|---|---|
| Contract signed | Day 1 | Read lock, extension, and incentive terms; pay the deposit |
| Soft pull pre-approval | Before or right after signing | Share income and asset documents |
| Design selections | Weeks 2 to 8 | Choose finishes; price upgrades separately |
| Construction | 6 to 12 months | Keep income and credit stable; watch for schedule updates |
| Lock decision | Often 60 to 90 days before completion | Lock or extend, based on the builder’s updated date |
| Final inspection and appraisal | Last 2 to 4 weeks | Walk the home; list punch items |
| Closing | Completion | Sign, fund, and receive keys |
Closing Costs, Deposits, and Hanover County Property Taxes on a New Build
The cost categories on a new build look familiar, but a few behave differently.
| Category | What it is | New build note |
|---|---|---|
| Builder deposit | Earnest money paid at signing | Usually credited at closing; ask about refund terms |
| Appraisal | Valuation of the finished home | Based on plans for a to-be-built home; upgrades can create a gap |
| Title and settlement | Title search, insurance, and closing fees | One closing with a one-time-close loan |
| Prepaid items | Tax and insurance escrows, prepaid interest | Tax escrow may differ from the finished-home figure |
| Incentives | Lender-paid or builder-paid credits | Can create no-out-of-pocket closing options when the numbers support it |
Property tax deserves its own look. New construction is often assessed first on the land or on partial completion, so your first tax bill and your escrow can differ from the finished-home figure. Hanover County sets its real estate tax rate each year, and you can find the current rate on hanovercounty.gov. Check it there as of today (November 2026) rather than relying on my illustrative number from the opening.
Builders often offer an incentive if you use their preferred lender. Read the contract for what the incentive is worth, what conditions attach, and whether it disappears if you choose someone else. Then compare it against the total cost of each loan, not just the credit. You are generally free to compare options, and the CFPB publishes guidance on RESPA and affiliated business disclosures that explains what the builder’s lender must tell you. This is where Dare to Compare, my pricing challenge, fits: you put quotes side by side, with no promised result.
Finally, check eligibility for Virginia Housing down payment assistance. Program terms and credit minimums change, so confirm them on their site and ask me how a program fits your loan type before you assume anything.
Broker vs. Bank vs. National Lender for a New Build
The difference between these models is structural. A retail lender works from its own set of loan products. I shop your loan across hundreds of wholesale lenders, which can matter when a build has an unusual lock or documentation need. Each company below deserves credit for what it does well. The descriptions are general, and I have not verified current construction products for every company, so confirm each on its own website.
| Company | Business model | Construction products | Local presence | Where it fits |
|---|---|---|---|---|
| Duane Buziak (independent broker) | Broker shelf: I shop your loan across hundreds of wholesale lenders | Construction-to-permanent and standard purchase at completion, depending on the lender used | Licensed in VA; legal office in Glen Allen, VA | Buyers who want options compared on the same build |
| Movement Mortgage | Retail lender with branches nationwide | Confirm on its site | Branch network; confirm Richmond-area locations | Buyers who prefer a single retail lender with in-house servicing |
| Rocket Mortgage | Large national, online-first retail lender | Confirm on its site | Digital; no local office needed | Buyers comfortable with an online process on a standard purchase |
| C&F Mortgage | Mortgage arm of a Virginia-based financial company | Confirm on its site | Virginia roots; confirm local offices | Buyers who value a Virginia-based lender |
| Southern Trust Mortgage | Retail mortgage lender | Confirm on its site | Mid-Atlantic and Southeast focus; confirm Richmond-area presence | Buyers who want a regional retail lender |
| Sparrow Home Loans | Retail mortgage lender | Confirm on its site | Confirm service area on its site | Buyers who want a smaller retail lender |
| Lower.com | Retail lender; PowerTPO is Lower, LLC’s wholesale arm | Confirm on its site | Digital | Buyers who want a direct-to-lender digital process |
Lower, LLC’s wholesale arm is PowerTPO, and I have direct wholesale access to it without a retail markup. That is a statement about access, not about pricing. I make no claim that any model produces a lower cost, and a builder-affiliated or retail lender may be the right call for your contract. The comparison is yours to run.
Common Mistakes Atlee Buyers Make on New Construction Financing
- Signing before pre-approval. Once the contract is signed, the lock and extension terms are already fixed. Get pre-approved first and read those terms with a loan in mind.
- Assuming the builder’s lender is the only option. You can generally compare other lenders, and a different lender does not by itself delay closing. A prepared file and a clear timeline are what protect your closing date.
- Not budgeting beyond the base loan. Upgrades, landscaping, fencing, and window coverings are often outside the base loan. Appraisals value the home as specified, so if you add $30,000 of upgrades and the appraisal supports only part of that value, you cover the gap in cash.
- Letting credit or income change. Lenders re-verify before closing. A new car loan, a job change, or a large unexplained deposit during a nine-month build can disrupt the file. Talk to me before making any major financial move.
Frequently Asked Questions About Atlee VA New Construction Mortgages
What is the difference between a construction-to-permanent loan and a standard purchase loan?
A construction-to-permanent loan funds the build in draws, then converts to a regular mortgage after completion, with one closing. A standard purchase loan closes when the home is finished, and the builder carries construction costs. Which one you use depends mostly on how the builder sells the home.
What is the minimum down payment by loan type?
It varies by program. Conventional options can start as low as 3% for qualifying buyers, FHA is generally 3.5% with qualifying credit, and VA can allow no down payment with full entitlement. These figures change, so confirm them on Fannie Mae, HUD, and VA.gov as of 2026.
Can I use a VA loan on a new build?
Yes, when the home meets VA’s minimum property requirements and the required documentation is complete. The Certificate of Eligibility can usually be pulled electronically on your behalf. VA.gov lists the current new-construction steps, so check there as of 2026 before you sign a contract.
How long does a rate lock last?
Standard locks commonly run 30 to 60 days, though lenders offer other lengths. A 6 to 12 month build usually needs an extended lock, a later lock, or a float-down option. Availability and cost vary by lender and change, so ask for the terms in writing.
How does the appraisal work on a to-be-built home?
The appraiser values the home from the plans and specifications, using comparable sales. It is then typically checked again at completion. If upgrades push the price above appraised value, you generally cover the difference in cash or renegotiate with the builder.
What happens if the build is delayed?
Delays can cause a lock to expire, which may mean paying for an extension or re-locking at current market cost. Your contract should state how completion dates and extensions are handled. Read those terms before signing and tell me immediately if the schedule moves.
How are property taxes handled during construction?
New construction is often assessed on land or partial completion first, so early bills can be lower than the finished-home figure. Your escrow may be adjusted after the full assessment. Check the current Hanover County rate on hanovercounty.gov as of 2026.
Do I have to use the builder’s preferred lender?
Generally no. Builders may offer an incentive for using their lender, but you can compare other options. Read the contract to see what the incentive requires, and review the CFPB’s guidance on RESPA and affiliated business disclosures.
Am I eligible for down payment assistance?
Possibly. Virginia Housing publishes its programs, income and price limits, and credit minimums, which change. Check eligibility on virginiahousing.com as of 2026, then bring the details to me so we can confirm how the program fits your loan type.
How do I start with a soft pull?
Call 804-212-8663 or apply online to begin a NoTouch Credit Pull soft pull pre-approval, which means no credit hit, no cost, no fees, and no commitment. You share basic income and asset details, and we review your options before any hard inquiry is made.
Match the Structure to Your Lock, Loan Type, and Contract
On a new build, the loan you pick follows from three things: how long your lock needs to last, which loan type fits your down payment and eligibility, and what the builder contract says about timing and incentives. Get those three clear before you sign, not after. I have been helping families find their new homes since 2014, with 2,000+ verified reviews across all platforms.
Ready to see what you qualify for in Hanover County? Duane Buziak, VA Broker of the Year 2024 & 2025 and Scotsman Guide Top Originator, runs a soft credit check first so there is no hard inquiry on your credit report. Call 804-212-8663 or apply online at Hanover Mortgage by Duane Buziak. Duane Buziak, NMLS #1110647.





